The roadways included in Stage 2 include:
· Le High Avenue from East Lake Avenue Bridge to Patriot Boulevard
· Compass Drive from Le High Avenue to Patriot Boulevard
Stage 2 work includes concrete curb & gutter replacements, sidewalk replacements, milling the existing asphalt surface, paving a new asphalt surface, pavement striping, and other miscellaneous tasks.
Work Anticipated to be performed, September 17th to September 211st.
· Landscaping should be completed on Monday, weather permitting
- Monday / Tuesday Le High and Compass will be oiled prior to paving. Please keep in mind that once the road is oiled, please drive slowly in the oiled areas, to help prevent the oil from sticking to your cars.
- Tuesday Paving surface will commence, starting at Le High and Patriot and working to the South.
There will be no full roadway closures, although travel delays are expected as the work is performed.
I would like to say Thank You in advance for your patience.