The roadways included in Stage 2 include:
·
Lehigh Avenue from East Lake Avenue Bridge to
Patriot Boulevard
·
Compass Drive from Lehigh Avenue to Patriot
Boulevard
Stage 2 work includes concrete curb & gutter
replacements, sidewalk replacements, milling the existing asphalt surface,
paving a new asphalt surface, pavement striping, and other miscellaneous tasks.
There will be no full roadway closures, the travel delays
are expected as the work is performed.